PROJECT TYPE:
Modular Construction of additional classrooms
DESCRIPTION:
Modular construction of 6 free standing classroom buildings; 4 two story, 4 classroom buildings; 2 single story, 2 classroom buildings.
OWNER:
Yonkers Public School District
ARCHITECT:
C. Schmidt Architects
CONSTRUCTION COST:
$ 3.6 million

Yonkers Public Schools modular addition to six different schools
Yonkers Public School District, Yonkers NY

The Yonkers Public School district was looking for a quick, economical way to ease the tremendous overcrowding throughout the district. Modular Construction was the ideal solution. In all, 6 free standing classroom buildings where constructed.

At M L K Junior High Technical and Computer Management School, PS 14, PS 17 and PS 24, two story buildings where constructed each housing 4 classrooms. Each of the two story buildings consisted of eight modules. Each building has factory installed elevator shafts as well as internal stair towers. At PS 8 and PS 30, single story buildings were constructed, each with two classrooms. Each of the single story buildings consists of 3 modules

Full brick veneer was used to seamlessly tie the buildings in with the pre-existing school buildings. The classrooms featured custom stainless steel bookcases as well as custom mechanical equipment.

   
Home    |    About Axis    |    Clients    |    Services    |    Projects    |    Modular    |    Careers    |    Contact Us
theaxisgroup.com © 2010 | Privacy Policy | Terms Of Use