PROJECT TYPE:
Fresh Kills Landfill Methane Recovery Facilty
DESCRIPTION:
Provide construction related services to supply and install four pre-engineered buildings totally over 5,000 sq. ft. Pre-engineered building are utilized as equipment Control Centers and protective housing for specilized compressor units.
OWNER:
NYC Department of Sanitation
ARCHITECT:
NYC Department of Sanitation
CONSTRUCTION COST:
$ 214,000



Pre-engineered Equipment Shelters
Fresh Kills Landfill

When the NYC Department of Sanitation needed equipment shelters for the new Methane Recovery Plant being constructed at the Fresh Kills Landfill, Axis was chosen ahead of others. Axis' solution was a steel building system, which offers significant cost and performance advantages over conventional construction methods. With systems construction, each part is engineered and designed to assemble together with greater speed and precision than is generally possible using conventional methods.

The advantages of steel-systems construction and metal roof systems include:

    • Faster installation
    • Lower lifecycle costs for greater return on investment
    • Compelling sustainability attributes
    • Virtually unlimited design flexibility

   
Home    |    About Axis    |    Clients    |    Services    |    Projects    |    Modular    |    Careers    |    Contact Us
theaxisgroup.com © 2009 | Privacy Policy | Terms Of Use