RADIATION ONCOLOGY CENTER – LINEAR ACCELERATOR
Winthrop University Hospital – Mineola, NY

Constructing a building to house a linear accelerator, while creating a warm setting in which cancer patients could come and receive treatment was the challenge put forth by Winthrop University Hospital.
In order to accelerate the construction process, three different methods of construction where used. The project team employed the use of stick built construction, modular construction, and structural concrete.
Successfully marrying the different methods of construction proved to be challenging. Another obstacle presented during construction was in joining the six modules used to construct the building to the site built vault, due to its delicate nature.
Construction of the Radiation Oncology Center included construction of a reception area, three physicians’ offices, a nurses’ control station, patient exam rooms, dressing rooms, a computerized tomography simulator, and a Clinac chiller. A computer controlled mechanical system was installed. All of the mechanical systems for the free standing building where connected to the hospital’s main engineering source.