Modular Construction

Axis Modular Systems

has completed hundreds of successful permanent modular projects. Our success spans key sectors—healthcare, industrial, K-12, pre-school, higher education, government, multi-unit housing, pharmaceutical, retail, and more. And we’ve won more modular industry awards than any other CM/GC we compete against. Take advantage of our expertise to maximize the advantages of modular construction for your project:

Budget Certainty

Modular construction occurs in a controlled manufacturing environment, ensuring maximum efficiency. It avoids costly delays due to bad weather or labor shortages, as well as expensive materials spoilage. No wonder we reduce the 10-25% contingency typical with conventional site construction by 90% or more.

Schedule Acceleration

Open your medical center, retail store, office building, manufacturing facility, college dorm, classroom, ER expansion, etc. months sooner with modular. Because module fabrication starts at the same time as site work begins (or even before), we beat conventional construction schedules by 30-50% every time.

Least Site Impact

Up to 85% of construction activity takes place off site, minimizing construction dust, noise, traffic, and safety hazards. It’s ideal for constrained sites with little/no laydown area, like college campuses, hospital grounds, corporate sites, and dense urban settings, as well as environmentally-sensitive terrain.

Avoid Operational Disruption

Not only are there dramatically fewer workforce traffic/parking headaches, materials deliveries, and overall hassles, but the duration on site is much shorter. That means patients, customers, staff, employees, etc. avoid weeks and months of construction detours, safety hazards, and disruption.

Greater Sustainability

Efficient manufacturing under controlled conditions reduces the typical 25% general waste of conventional site construction to less than 2%. Instead of shipping, packaging, and construction materials ending up in local landfills, 98% of it is recycled, re-purposed, re-used, or avoided completely.

Higher Quality

Manufacturing under controlled conditions using a highly-trained, in-place workforce removes all the quality-control variables that negatively impact projects built out in the weather by workforces with varying degrees of training and capabilities. The result is higher quality, greater reliability, and lower lifetime maintenance costs.

Why risk the success of your modular project with a CM/GC whose modular expertise may not measure up? Trust Axis Modular Systems.