For Clean Earth, a company deeply rooted in environmental services, this modular branch office is a physical reflection of its sustainability mission. The modular method greatly minimized construction waste and site disturbance, reducing the building’s embodied carbon footprint. In addition, it incorporates high-efficiency HVAC systems, LED lighting, low-VOC materials, advanced insulation, and energy-efficient glazing.
Simultaneous off-site fabrication and onsite preparation drastically reduced the construction timeline, speeding completion. Despite the complexity of an adjoining operational site and a tight delivery timeline, the modular approach enabled exceptional cost control. Off-site fabrication mitigated risk of weather delays and material waste, reducing overall project costs.
The integration of dedicated locker rooms, flexible open office space, and multipurpose rooms within a compact, relocatable structure added significant value without inflating the budget.
By combining field & administrative functions in a single facility, Clean Earth reduced the need for separate infrastructure and improved operational cohesion. The project delivers a high-value, scalable office solution with lower total cost of ownership. The result is a well-balanced, higher-performance environment that supports both individual focus & team synergy.
PROJECT TYPE
Volumetric 2-Story Modular Construction
DESCRIPTION
Branch Office/Locker Room
OWNER
Clean Earth
ARCHITECT
Design-Build/Axis Construction
DELIVERY METHOD
Design-Bid-Build
CONSTRUCTION COST
$1 million
SIZE
2,800 sq. feet
For Clean Earth, a company deeply rooted in environmental services, this modular branch office is a physical reflection of its sustainability mission. The modular method greatly minimized construction waste and site disturbance, reducing the building’s embodied carbon footprint. In addition, it incorporates high-efficiency HVAC systems, LED lighting, low-VOC materials, advanced insulation, and energy-efficient glazing.
Simultaneous off-site fabrication and onsite preparation drastically reduced the construction timeline, speeding completion. Despite the complexity of an adjoining operational site and a tight delivery timeline, the modular approach enabled exceptional cost control. Off-site fabrication mitigated risk of weather delays and material waste, reducing overall project costs.
The integration of dedicated locker rooms, flexible open office space, and multipurpose rooms within a compact, relocatable structure added significant value without inflating the budget.
By combining field & administrative functions in a single facility, Clean Earth reduced the need for separate infrastructure and improved operational cohesion. The project delivers a high-value, scalable office solution with lower total cost of ownership. The result is a well-balanced, higher-performance environment that supports both individual focus & team synergy.